GOODFELLOW SOLUTIONS RELEASE & HANDOVER CHECKLIST Planning aid | Version 1 | October 2026 Tailor this checklist to the system, agreed scope and applicable requirements. Use evidence and named owners. A completed template does not establish a certification, conformance determination or authorization to operate. System / service: Release identifier: Target environment: Release owner: Approving authority: Receiving support team: For each item, record: status | evidence location | owner | open action. Suggested statuses: Ready / Open / Not applicable (with reason). SCOPE AND ACCEPTANCE [ ] The release maps to approved requirements and acceptance criteria. [ ] User journeys and failure paths were demonstrated or tested. [ ] Results identify the environment, data and version tested. [ ] Open defects and limitations have a recorded disposition and owner. [ ] Required stakeholders have made the release decision. SOURCE AND BUILD [ ] Source, configuration and dependency versions are identified. [ ] A receiving engineer can follow the build instructions. [ ] Artifacts and release records can be traced to the approved change. [ ] Repository access, delivery formats and licenses are addressed. DEPLOYMENT AND RECOVERY [ ] Environment differences and deployment prerequisites are documented. [ ] Identity, secrets and access follow the agreed handling process. [ ] Deployment approvals and required release windows are confirmed. [ ] Rollback or recovery steps and decision triggers are documented. [ ] The agreed recovery exercise was performed in an approved environment. [ ] Recovery results, unresolved dependencies and follow-up work are recorded. [ ] Data reconciliation and migration recovery are addressed where applicable. SECURITY AND ACCESSIBILITY WORK [ ] Applicable requirements and test methods are identified. [ ] Code and dependency findings have been reviewed and dispositioned. [ ] Design risks and unresolved vulnerabilities have owners. [ ] Critical journeys include applicable keyboard and assistive-technology tests. [ ] Accessibility defects, remediation and retest evidence are recorded. [ ] The required reporting or conformance documentation is assigned. OPERATIONS [ ] Logs, service signals and alert response procedures are accessible. [ ] An owner and escalation route exist for each critical dependency. [ ] Backup, restore and maintenance responsibilities are assigned. [ ] Support hours and response expectations are agreed. [ ] Known failure modes and initial diagnostic steps are documented. HANDOVER [ ] Architecture, interfaces and significant decisions are documented. [ ] Runbooks identify prerequisites, expected results and escalation points. [ ] The receiving team has completed the agreed walkthrough or exercise. [ ] Access transfer and removal of unneeded access are assigned. [ ] Deferred work and remaining risks have owners and next actions. [ ] The acceptance record identifies outstanding conditions. RELEASE DECISION Decision (release / defer / release with agreed conditions): Evidence reviewed: Open conditions and owners: Rollback decision authority: Approved by / date: Planning references (verify applicable requirements for your engagement): NIST Secure Software Development Framework: https://csrc.nist.gov/projects/ssdf GSA accessibility testing lifecycle: https://www.section508.gov/test/testing-lifecycle-overview/ This checklist is a planning aid. Required evidence and contractual obligations are defined by the project, not by this template.